Oct 12, 2017· The simulation calculations reveal that the 225 MW power unit can operate between 40 and load with reasonable efficiency. Power unit operation with reduced minimum load allows decreasing startup and shutdown operation costs. Reducing the minimum load of conventional coalfired power plants strongly influences operation of the steam turbine.